翻訳と辞書 |
Três Irmãos Dam : ウィキペディア英語版 | Três Irmãos Dam
The Três Irmãos Dam is an embankment dam with gravity sections on the Tietê River in Pereira Barreto of São Paulo state in Brazil. The dam is about upstream of the river's confluence with the Paraná River. It supports the largest hydroelectric power station on the river with an installed capacity of . The dam was completed in 1991 and the five Francis turbine-generators were commissioned between November 1993 and January 1999. It is owned and operated by Companhia Energética de São Paulo (CESP). The dam also provides for navigation with two ship locks. ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Três Irmãos Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|